Project Experience

Home » Project Mustang

Job Details

Job Size: 19,000 sf
Job Type: IMP Install

Project Mustang

Bethlehem, PA

This was a design build project for a 19,000 square foot Zero degree freezer and a 13,000 square foot 34 degree cooler within a new fully automated beverage facility. Our responsibilities included Insulated panels for the freezer and cooler, underfloor insulation, column isolation blocks, vapor barrier, cold storage doors.

Materials used on the project: All Weather Insulated Panels DM40, Stucco Embossed, Shadowline, Imperial White. 5” Thick Wall Panels at 49’8” tall for the freezer area and 4” thick Wall Panels at 49’8” tall for the cooler area. Also used on the project were Hercules cooler and freezer doors (Personnel and Bi-Parting).

Related Projects

  • A large, empty industrial cold storage room with a polished concrete floor, white insulated walls, ceiling-mounted cooling units, and bright overhead lights. There is a roll-up door and control panel in the far corner.

    JAS Cooler

    Elizabethtown, PA
  • Large, empty warehouse with concrete floor, high ceiling, exposed beams, and yellow safety bollards. Construction materials and equipment are scattered around, with bright overhead lights illuminating the space.

    Sunbasket

    Westampton, NJ
  • Aerial view of a large white industrial warehouse with multiple loading docks, trucks parked nearby, and surrounding greenery and trees in the background.

    Weavers of Wellsville

    Wellsville, PA
  • Workers in safety gear remove debris from a rooftop while a large white prefabricated structure is being lifted by a crane in the background. Yellow caution tape surrounds the work area.

    Hershey Creamery

    Middleton, PA