Project Experience

Home » Advance Pierre

Job Details

Job Size: 77,000+ sq.ft. manufacturing facility
Job Type: Design/Build

Advance Pierre

Vineland, NJ

Description coming soon.

Related Projects

  • Workers in safety gear remove debris from a rooftop while a large white prefabricated structure is being lifted by a crane in the background. Yellow caution tape surrounds the work area.

    Hershey Creamery

    Middleton, PA
  • A crane lifts a large metal container onto a flatbed truck outside an industrial building, while workers in safety vests and hard hats guide the operation under a clear blue sky.

    Tyson Foods

    Vineland, NJ
  • A worker stands on an orange boom lift next to a tall building while a crane hoists a platform overhead against a blue sky with scattered clouds.

    Puratos

    Pennsauken, NJ
  • A large white industrial warehouse with loading docks and several trucks and cars parked outside, surrounded by greenery and a mostly empty parking lot, viewed from above.

    Arcadia Cold Storage

    Bethlehem, PA