Job Details
Job Size: 19,000 sf
Job Type: IMP Install
Project Mustang
Bethlehem, PAThis was a design build project for a 19,000 square foot Zero degree freezer and a 13,000 square foot 34 degree cooler within a new fully automated beverage facility. Our responsibilities included Insulated panels for the freezer and cooler, underfloor insulation, column isolation blocks, vapor barrier, cold storage doors.
Materials used on the project: All Weather Insulated Panels DM40, Stucco Embossed, Shadowline, Imperial White. 5” Thick Wall Panels at 49’8” tall for the freezer area and 4” thick Wall Panels at 49’8” tall for the cooler area. Also used on the project were Hercules cooler and freezer doors (Personnel and Bi-Parting).