Project Experience

Home » Hershey Creamery

Job Details

Job Size: 120,000 sf
Job Type: IMP Install

Hershey Creamery

Middleton, PA

Installed 120,000 square feet of Metl Spans CF42 – 4”; 5” and 6” thick, Stucco Embossed White Insulated Wall Panels, 200,000 board feet of 3” thick 40PSI underfloor insulation, a total of Twenty-Eight (28) cold storage doors of various sizes and finishes and Fourteen (14) cold storage windows.

Related Projects

  • A worker stands on an orange boom lift next to a tall building while a crane hoists a platform overhead against a blue sky with scattered clouds.

    Puratos

    Pennsauken, NJ
  • Aerial view of a large commercial building under construction, showing a steel frame structure with a partially completed roof, surrounded by dirt, grass, and nearby buildings under a blue sky.

    John Gross

    Mechaniscburg, PA
  • Construction workers using green boom lifts and cherry pickers to work on the exterior walls and windows of an industrial building. The ground is wet and several workers are visible wearing safety gear.

    Dorman Products

    Hatfield, PA
  • A large, empty industrial cold storage room with a polished concrete floor, white insulated walls, ceiling-mounted cooling units, and bright overhead lights. There is a roll-up door and control panel in the far corner.

    JAS Cooler

    Elizabethtown, PA